Case study: Fresh air for employees of MilliporeSigma distribution center

In this case study, you will read:

  • Why MilliporeSigma was looking for an energy-efficient cooling solution for its distribution center in Visalia, California
  • The challenges faced by MilliporeSigma to achieve a comfortable climate for its employees
  • How 99000 CFM (168000 m3/h) of fresh air and low GHG emissions are achieved with the installation of 12 IntrCooll units

Download the case study by filling out the form.

Download case study