Case study: Four-season climate control for 247TailorSteel

In this case study, you will read:

  • Why 247TailorSteel was looking for an energy-efficient cooling solution for its factories
  • The challenges faced by 247TailorSteel like high internal heat load, negative pressure, unstable temperature, lack of fresh air, and insufficient ventilation
  • How Oxycom's climate control provided heating, cooling, and ventilation in one for 247TailorSteel employees 

Download the case study by filling out the form.

Download case study